CO129-117 - Public Offices - 1866 — Page 178

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

to

with Brickwork backed

the Rock with concrete.

The vertical valve, well

+

to the centre. Live

of

Aud

way

flush

be near

may the Bank

be divided vertical

sketched - The valves being placed

in the dive

dividing partition

-

Bank

water level

inner Culvert and rise in the

the uver

half of the valve well the outer half and culvert will be dry when the valves are not open -

176

The proposed dimensions of the Bye Wash are ample - Concrete

should be used in the construction

of this work in place of puddle

vertical steps not

greater than

three feet should be formed

Outer Culvert.

Inner Culvert

with an inward slope

ao

Cross Section of Bank along of outlet Culvert and Valve

line of outer

well

The Midfeather in the valve

well should be

of cast iron.

The Valves to be fixed in

as indicated

it

The water will fill the

...

Longitudinal Section

of proposed Bye Wash.

All through the work Concrete should be used rather than

puddle, where there is

liability

of any wash, creek & water

Edit History

2026-05-19 13:07:01 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
to with Brickwork backed the Rock with concrete. The vertical valve, well + to the centre. Live of Aud way flush be near may the Bank be divided vertical sketched - The valves being placed in the dive dividing partition - Bank water level inner Culvert and rise in the the uver half of the valve well the outer half and culvert will be dry when the valves are not open - 176 The proposed dimensions of the Bye Wash are ample - Concrete should be used in the construction of this work in place of puddle vertical steps not greater than three feet should be formed Outer Culvert. Inner Culvert with an inward slope ao Cross Section of Bank along of outlet Culvert and Valve line of outer well The Midfeather in the valve well should be of cast iron. The Valves to be fixed in as indicated it The water will fill the ... Longitudinal Section of proposed Bye Wash. All through the work Concrete should be used rather than puddle, where there is liability of any wash, creek & water
Baseline (Original)
to with Brickwork backed the Rock with concrete. The vertical valve, well + to the centre. live of Aud шау flush be near may the Bank be divided vertical sketched - The valves being placed in the dive dividing partition - Bank water level inner Culvert and rise in the the uver half of the valve well the outer half and culvert with be dry when the valves are not open - 176 The proposed dimensions of the Bye Wash are ample - Concrete should be used in the construction of this work in place of pudale vertical steps not ater than & greater three feet should be formed Outer Culvert. Frever Culver with an inward slope ao Cross Section of Bank along of outlet Culvert and Valve live of oute well The Midfeather in the valve well should be Cast crow. of cast The Valves to be fixed in as indicated it The water will fill the ارمرز Louphudinal Section of propspored By was. All through the work Concrete should be used rather than puddle, where there is liability of of any wash, creek & water
2026-05-19 13:07:01 · Baseline
View content

to

with Brickwork backed

the Rock with concrete.

The vertical valve, well

+

to the centre. live

of

Aud

шау

flush

be near

may the Bank

be divided vertical

sketched - The valves being placed

in the dive

dividing partition

-

Bank

water level

inner Culvert and rise in the

the uver

half of the valve well the outer half and culvert with be dry when the valves are not open -

176

The proposed dimensions of the Bye Wash are ample - Concrete

should be used in the construction

of this work in place of pudale

vertical steps not

ater than

& greater

three feet should be formed

Outer Culvert.

Frever Culver

with an inward slope

ao

Cross Section of Bank along of outlet Culvert and Valve

live of oute

well

The Midfeather in the valve

well should be

Cast crow.

of cast

The Valves to be fixed in

as indicated

it

The water will fill the

ارمرز

Louphudinal Section

of propspored By was.

All through the work Concrete should be used rather than

puddle, where there is

liability

of

of any wash, creek & water

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.